ECT 125 Week 3 iLab 2 Inductor Phase Shift Latest
ECT 125 Week 3 iLab 2 Inductor Phase Shift New
Inductor Phase Shift
iLab Steps
Part I: Phase Shift Measurement
1.Construct the circuit shown below on your breadboard.
2.Set the function generation to provide a 1 VRMS amplitude sine wave at 500 Hz. Measure the inductor voltage and the phase shift between the source and inductor voltage.
Part II: Time and Voltage Measurement
1.Construct the circuit shown below on your breadboard.
2.Set the function generation to provide a 1 VRMS amplitude sine wave at 200 Hz. Measure the inductor voltage and the phase shift between the source and inductor voltage. Note whether the phase shift is ahead of or behind the source.